A river boxed in: How the Box Canyon log jam came to be – and what can be done about it
The Box Canyon log jam ‘is something we aren’t playing with,’ City of Revelstoke director of engineering Steve Black says.
The Box Canyon log jam ‘is something we aren’t playing with,’ City of Revelstoke director of engineering Steve Black says.
The Box Canyon bridge idea, at an estimated cost of $750,000, has proved to be too expensive to be considered seriously by the city at this time.
The tourism-driven idea of creating a bridge across Box Canyon on the Illecillewaet River is at a preliminary stage. A preliminary cost estimate puts it around $750,000.